Crew Load & Schedule Conflict Detector

Enter today's jobs and instantly see overlapping crews, tight drive-time gaps, and idle windows you're not billing. Built for dispatchers and owner-operators who juggle crews every morning.

All calculations run in your browser. Job data is never sent or stored. Privacy-limited interaction analytics are described in our privacy policy. Works offline once loaded.

1 · Add jobs

Number of workers on site
Minutes of travel from the previous job
Hours (0.5 increments)

2 · Timeline

Job on site Drive time Conflict (overlap) Idle window (>45 min)

3 · Summary

4 · Suggestions & conflicts

Methodology — how conflicts, idle windows, and drive time are calculated

Conflict detection (time overlap)

Each job occupies a time block from its start time to its end time, where end time = start time + duration. If job B's start time falls before job A's end time, the two jobs overlap and are flagged as a conflict. This assumes a single crew — if you run multiple crews simultaneously, schedule them in separate tools or duplicate this tab.

Drive-time gaps

Each job has a "drive time from previous job" field in minutes. If the gap between the end of one job and the start of the next is less than the drive time entered, the schedule is too tight — you cannot physically get from job A to job B in time. If drive time is 0 but the two jobs are at different addresses, the tool still flags it as a potential conflict (you need some travel time between distinct sites).

Idle windows

After every job (including its drive-time block), the tool checks the gap until the next job starts. If that gap exceeds 45 minutes, it's flagged as an idle window. Idle time is billable capacity — a short service call, material pickup, or prep work could fill it.

Why 45 minutes?

45 minutes is a common industry benchmark for the minimum duration of a service call. Gaps shorter than that are too small to schedule meaningful work; gaps longer than 45 minutes represent lost billing opportunity.

Crew-hours and utilization

Total crew-hours = sum of (crew size × duration) for all jobs. Utilization = total job hours (excluding drive and idle) divided by the total span from first start to last end. A utilization below 70% means more than 30% of your available time is drive or idle — a signal to cluster jobs geographically or fill gaps.

Limitations

This is a daily planning tool, not a project scheduler. For multi-week scheduling, use a dedicated Gantt chart or construction scheduling tool. This tool does not account for traffic variability, weather delays, scope creep, or multi-crew parallel scheduling. It assumes a single crew moving sequentially through the day.

Get a free dispatch & scheduling review from Corbelworks

Tell us your trade and your biggest scheduling headache — we'll look at your day and reply within 1 business day. No pitch, no commitment.

Got it — we'll review and reply to your email within 1 business day.